Salaried technicians · more than one office

Less driving. Every route kept.

Fewer routes were on offer, and the owner said no. With salaried technicians a route less saves nothing on pay. The ask was shorter drives, balanced days, and a month planned without losing an afternoon to it.

In progressAuditLive

The goal from the first call

Shorter drives, without cutting a single route.

What the customer asked for

  • Mileage down, not the labour bill
  • Every existing route kept
  • Customer preferences never forced
  • The month planned without losing an afternoon

From the audit and the first planned month

−20%
Audit
Drive time
A past month planned again, every rule in place.
+17%
Audit
Stops per route
Same visits, same rules, same run.
Minutes
Live
To plan a month
Where the office used to spend two to three hours.

The rules that had to hold

What the plan was not allowed to break

  • Preferred technicians

    Kept wherever a customer has one, never overridden for a shorter route.

  • Preferred weekdays

    A customer booked for a weekday stays on it.

  • Technician calendars

    Not everyone works Monday to Friday. The plan follows each calendar.

  • Service areas

    Technicians with a drawn area keep their visits inside it.

  • Booked visits

    Visits already booked keep their day. New work goes in around them.

  • Balanced days

    Work spread evenly, with a cap on stops per route.

Step by step

From the first audit to a planned month

  1. 1

    AuditSep 2026

    A past month, planned again within days

    Read-only, with every rule in place and nothing switched off. Back came 20% less drive time and 17% more stops per route, and fewer routes than the office runs.

    PestRouting · Route audit
    Route audit of one month, actual next to optimized. The first week on the map: on the actual side the four technicians cross each other’s areas; on the optimized side each technician keeps one territory, and the same 130 stops run on 18 routes instead of 20. Over the month, drive time share falls from 24.6% to 18.4%, total drive hours from 142 to 104 and distance per stop from 1.9 to 1.5 miles.
    Example screen with demonstration data.
  2. 2

    GoalSep 2026

    Keep the routes, take the shorter drives

    Max efficiency or territory is one switch per office. This owner chose balanced days with every route kept, because with salaried technicians that is where the saving is.

    PestRouting · Routing settings
    The PestRouting routing settings for one office: a Territory or Max efficiency switch, and a sentence that evens out production value across technicians, allowing each to sit 10% either side of a fair share.
    Example screen with demonstration data.
  3. 3

    SetupSep 2026

    Calendars, areas and booked visits, set once

    Each technician’s working days, the drawn service areas and the rule that booked visits keep their day went in once. From then on every plan starts from them.

    PestRouting · Work calendar
    A PestRouting office work calendar: a badge reading Inherits from Organization Settings with zero own values, a week showing Monday to Friday worked, a month listing Thanksgiving as inherited, and a default schedule card reading 07:00 to 18:00, out by 08:30, nine hours.
    Example screen with demonstration data.
  4. 4

    First monthSep 2026

    Planned in minutes. What could not fit came back with a reason

    The next month was planned in minutes. The handful of visits that could not fit, such as one on a preferred day its technician does not work, stayed open with the rule that blocked them instead of being forced onto a day.

    PestRouting · Stops with no slot
    The page of one stop the planner could not fit: the length and value it asked for, the single eligible day, its buffer, time of day, preferred weekdays and recurrence, and which technicians were allowed to take it.
    Example screen with demonstration data.

This story is for you if

  • Your technicians are salaried, so fewer routes is not the saving
  • Planning next month costs someone an afternoon
  • Technicians work different calendars or drawn areas

The audit runs the same first step on one month of your own data.

Questions about this story

What did this operation ask PestRouting for?
Shorter drives without cutting a single route: mileage down rather than the labour bill, customer preferences never forced, and the month planned without losing an afternoon to it.
Why keep every route if fewer routes are cheaper?
Cheaper depends on how technicians are paid. With salaried technicians a route less saves nothing on pay, while shorter drives save fuel and time on every route. PestRouting lets each office choose between max efficiency and territory.
What happens to a visit the planner cannot place?
It stays open with the rule that blocked it. Nothing is forced onto a day, and the office decides what to do with it.
How long does planning a month take?
Minutes. In this story the office spent two to three hours a month planning by hand before.
Read-only · written report · no pitch

Your office has its own story. Start it with one month.

30-minute intro call. We connect to FieldRoutes read-only, plan one real month of yours again under your rules and the goal you name, and walk you through the result. Nothing is written back.

Some audits come back saying your routes are already tight. You will hear that too.

Get Your Free Route Audit

A 30-minute intro call, a written report on what your routes are leaving on the table, and zero pressure to sign anything. We only follow up if you ask.

Book Your Free Analysis

Free analysis with no obligation

We'll analyze your current routes and show you the savings potential.

First call within 24 to 48 hours

Full analysis and written report typically ready within about a week.

Real people, start to finish

The people who build PestRouting run your audit and walk you through the results.

Risk-Free Opportunity

See exactly how much you could save before spending a dime.

Prefer to read first? See exactly how the audit works